Name the spaces and the result

Identify the property and the areas affected. Describe what will be removed, retained, installed, repaired and restored. Be precise about the extent of work: one wall, one room, a continuous floor area or a complete system.

Include the expected finished condition of adjoining areas. An opening between rooms can require trim, paint and flooring work beyond the opening itself. If an existing material cannot be matched exactly, ask how the finish boundary or acceptable alternative will be agreed.

Identify the controlling documents

List the relevant drawing titles, dates and revisions, together with specifications and approved selection schedules. Make it clear which version is current and how later revisions become part of the work. A collection of undated inspiration images is not a substitute.

Record important product information where it affects design, purchasing or installation. When a selection is not final, define the allowance or decision still required and how its price will be reconciled. Keep optional work outside the base scope until it is deliberately accepted.

Resolve interfaces and owner responsibilities

Some of the most useful scope questions concern work between packages. For example, who repairs the surface after another trade relocates a service? Who receives and inspects an owner-purchased fixture? Identify those responsibilities explicitly.

  • Protection, site access, temporary arrangements and cleanup
  • Design, permit and inspection coordination responsibilities
  • Purchasing, delivery, storage and installation of selected products
  • Repairs to adjacent finishes and disturbed landscaping
  • Testing or professional checks included in the scope
  • Handover documents, demonstrations and incomplete-item process

Make exclusions useful rather than vague

An exclusion should identify an understandable boundary. Ask what remains outside the price, who might perform it and whether the project depends on it. A necessary item excluded from one contract still belongs somewhere in the owner’s overall budget.

For unknown existing conditions, specify the investigation included and the process for documenting discoveries. Ask who evaluates a technical question and who may approve a change. Avoid filling an unresolved engineering or legal issue with a broad owner assumption.

Review the scope as a working document

Read it alongside the budget and schedule. Check whether long-lead decisions, access constraints or outside work contradict the proposed sequence. Give every revision a date and keep the accepted version accessible to the people doing the work.

The FTC recommends that written agreements capture the work and promises made during discussions. Use that principle to resolve omissions before signing. Have a qualified adviser review legal terms when needed; this checklist organizes the project description and does not prescribe contract language for every situation.

Sources & further reading